Method of Application
The product should be poured on to the surface and spread by a notched trowel. For the better finishing result, turn the notched trowel and smoothen the surface.
To obtain an even thicknees and get rid of entrained air. 5 minutes after application use the spiked roller in two directions perpendicular to each other. This is especially necessary when the coating has been filled with silica sand.
Wait for minimum 4 days before taking into service.
Do not keep the equipments in use for more than 40 minutes in the mixture; in case of delay, wash equipments with epoxy thinner.
Even though YAPIFINE BASE EPOXY POWER is solvent free, proper ambient ventilationn will help protect the operator, prevent condensation on paint film and ensure optimum coating performance.
Ventilation should continue during curing as well.